Project Description
Big Lots Distribution Facility. The project consisted of installing electrical conduit and wiring for new lighting package to match existing, 120V electrical outlets, fan and bracket installation and wiring, override switches for fans and fixtures, motion sensors, demolition of breaker panel above mezzanine, installation of new 120/208V panel, fire alarm system, CCTV system cameras and installation of Category 6 telecommunications cabling.
Projects Highlights
- Project Location
Montgomery, Alabama - General Contractor
Haskell - Project Duration
5 Months - Size of Project
600+ Thousand - Project Details
Design Build