Project Description
Big Lots Tremont included a full design build concerning, FA System and FA System pathways throughout the facility. The project consisted of design as well as providing and installing conduit pathways, cable tray pathways, power, FA equipment, FA devices, FA wire, FA programming and testing. The Project also included the installation of electrical receptacles, lighting package and the powering of two (02) 480v motors on McKeon Fire Shutters.
Projects Highlights
- Project Location
Tremont, Pennsylvania - General Contractor
Haskell - Project Duration
2 Months - Size of Project
77+ Thousand - Project Details
Design Build FA System/Electrical