Project Description
Anheuser Bush Can Plant Expansion included a full design build concerning the expansion areas Fire Alarm System, Public Address/Intercom System and Security System throughout the expansion area and into the existing area of the facility. The project consisted of the design of these systems as well as providing and installing conduit pathways, cable tray pathways, power, FA equipment, FA devices, FA wire, FA programming and testing, Public Address/Intercom System equipment, Public Address/Intercom System devices, Public Address/Intercom System wire, programming and testing, Security System equipment, Security System devices, Security System wire, Security System programming and testing as well as BIM Modeling.
Projects Highlights
- Project Location
Jacksonville, Florida - General Contractor
E.F. Lea - Project Duration
10 Months - Size of Project
750+ Thousand - Project Details
Design Build FA System, Public Address/Intercom System, Security System