Project Description
Full design build process controls for a fully automated wood pellet facility. The process involved unloading of southern yellow pine logs from tucks via the log crane and processing via the log line, chipper, stacker/reclaimer, drying, pelletizing, and load out of wood pellets to support environmental green fuel initiatives for Drax Power in the United Kingdom. The plant can produce up to 525,000 metric tons of pellets annually and is located on a 62-acre site.
Projects Highlights
- Project Location
Gloster, Mississippi - General Contractor
Haskell - Project Duration
12 Months - Size of Project
6.5+ Million - Project Details
Design Build Electrical Process Controls