Project Description
Fort Riley Warrior Zone included a full design concerning Audio/Visual System into the Electrical System. The project design included providing AutoCAD drawings/Design Documentation 60%, 90%, Permit Issue (PI), Construction Issue (CI), Engineering and Design Coordination, submittals/shop drawings and System Specifications. The project installation included providing and installing conduit pathways, cable tray pathways, Audio/Visual System equipment, Audio/Visual System devices, Audio/Visual System wire, Audio/Visual System programming, testing and training.
Projects Highlights
- Project Location
Fort Riley, Kansas - General Contractor
The Haskell Company - Project Duration
6 Months - Size of Project
630+ Thousand - Project Details
Design Build Audio/Visual System