Project Description
INO Project Palmer included a full design concerning Telecommunications System, Fire Alarm System, Access Control/Door Monitoring, IP Surveillance System, and Public Address System into the Electrical System. The project design included AutoCAD drawings/Design Documentation 60%, 90%, Permit Issue (PI), Construction Issue (CI), BIM modeling, Engineering and Design Coordination, submittals/shop drawings, and Specifications for all systems. The project installation included providing and installing conduit pathways, cable tray pathways, power, telecommunications fiber optic backbone cabling, telecommunications copper backbone cabling, horizontal copper cabling, cabinets, racks, patch panels, wire managers, telecommunications terminations, testing, FA equipment, FA devices, FA wire, FA programming and testing, Public Address/Intercom System equipment, Public Address/Intercom System devices, Public Address/Intercom System wire, programming and testing, Access Control/Door Monitoring equipment, Access Control/Door Monitoring devices, Access Control/Door Monitoring wire, Access Control/Door Monitoring programming and testing, IP Surveillance System equipment, IP Surveillance System devices, IP Surveillance System wire, IP Surveillance System programming and testing, The project further included onsite training for all systems.
Projects Highlights
- Project Location
Colorado Springs, Colorado - General Contractor
The Haskell Company - Project Duration
12 Months - Size of Project
1.4+ Million - Project Details
Design Build Telecommunications System, Fire Alarm System, Public Address System, Access Control System, IP Surveillance System