Mercedes Benz included a full design build concerning, FA System, Telecommunications Cabling System, CCTV System and Access Control System throughout the expansion area as well as in the existing facility. The project consisted of preparing FA Engineered design drawings/permit issue drawings, specifications, shop drawings/submittals, permitting, as well as providing and installing conduit pathways, FA equipment, FA devices, FA wiring, FA programming, Telecommunications cabling, CCTV cabling, Access Control cabling, testing and training.
Projects Highlights
- Project Location
Jacksonville, Florida - General Contractor
The Haskell Company - Project Duration
4 Months - Size of Project
258+ Thousand - Project Details
Design Build FA System, Telecommunications System, CCTV System, Access Control System