Project Description
ViaStore is a leading international provider of automated material handling solutions including AS/RS (automated storage and retrieval systems) and conveyor systems, shuttle systems, warehouse management systems software, material flow and process controls, and integrated SAP logistics solutions. The project consisted of installing cable tray system, conduit and wire to disconnect motors, 24V DC motors, proximity switches, solenoid valves, 27V IOP supplies, AUX I/O, Movi Switch, installation of motor starter disconnect combos, power conduit and wiring to ASRS cranes, PROFIBUS cabling to ASRS cranes and grounding system to floor rails.
Projects Highlights
- Project Location
Middleton, Pennsylvania - General Contractor
ShayCore - Project Duration
5 Months - Size of Project
800+ Thousand - Project Details
Design Build