EF Lea Electrical Contractors

March 4, 2021

Frito-Lay Jonesboro

Frito-Lay Jonesboro included a full design build concerning, FA System and FA System pathways throughout the facility. The project consisted of preparing FA Engineered design drawings/permit issue drawings, specifications, shop drawings/submittals, permitting, as well as providing and installing conduit pathways, […]
March 4, 2021

AB InBev Systems

Anheuser Bush Can Plant Expansion included a full design build concerning the expansion areas Fire Alarm System, Public Address/Intercom System and Security System throughout the expansion area and into the existing area of the facility. The project consisted of the […]