Project Description
Frito-Lay GES Rancho Cucamonga included a full design build concerning, FA System and FA System pathways throughout the facility. The project consisted of preparing FA Engineered design drawings/permit issue drawings, specifications, shop drawings/submittals, permitting, as well as providing and installing conduit pathways, cable tray pathways, power, FA equipment, FA devices, FA wiring, FA programming and testing.
Projects Highlights
- Project Location
Rancho Cucamonga, California - General Contractor
The Haskell Company - Project Duration
4 Months - Size of Project
296+ Thousand - Project Details
Design Build FA System