Haskell

March 4, 2021

Project Jupiter

Project Jupiter included a full design concerning Telecommunications System, Fire Alarm System, BDA System, Public Address System, Access Control/Door Monitoring System, IP Surveillance System, Audio Visual System, BMS /HVAC Controls, Motorola Radio System into the Electrical System. The project design […]
March 4, 2021

Rolls Royce

Rolls Royce included a full design concerning Telecommunications System, Fire Alarm System, Access Control/Door Monitoring System, CCTV System and Public Address System into the Electrical System. The project design included AutoCAD drawings/Design Documentation 60%, 90%, Permit Issue (PI), Construction Issue […]
March 4, 2021

SAFT Project Thunderbolt

SAFT Project Thunderbolt included a full design concerning Telecommunications System, Fire Alarm System, Access Control/Door Monitoring System, CCTV System, Audio Visual System and Public Address System into the Electrical System. The project design included AutoCAD drawings/Design Documentation 60%, 90%, Permit […]
March 4, 2021

Sheetz Expansion Claysburg

Sheetz Expansion Claysburg included a full design build concerning, FA System and FA System pathways throughout the expansion area as well as in the existing facility. The project consisted of preparing FA Engineered design drawings/permit issue drawings, specifications, shop drawings/submittals, […]