Haskell

March 4, 2021

Big Lots Montgomery

Big Lots Distribution Facility. The project consisted of installing electrical conduit and wiring for new lighting package to match existing, 120V electrical outlets, fan and bracket installation and wiring, override switches for fans and fixtures, motion sensors, demolition of breaker […]
March 4, 2021

Nestle Allentown

Nestle Waters Bottling Facility. The LEED compliant facility is comprised of 20,100 square feet of Class A office space, 286,000 square feet of storage space and 268,620 square feet of process space. The 588,000 square foot facility and supporting infrastructure […]
March 4, 2021

Drax Morehouse BioEnergy

Full design build process controls for a fully automated wood pellet facility. The process involved unloading of southern yellow pine logs from rail car and processing via the log line, chipper, stacker/reclaimer, drying, pelletizing, and load out of wood pellets […]
March 4, 2021

Drax Amite BioEnergy

Full design build process controls for a fully automated wood pellet facility. The process involved unloading of southern yellow pine logs from tucks via the log crane and processing via the log line, chipper, stacker/reclaimer, drying, pelletizing, and load out […]
March 4, 2021

Project Jupiter

Project Jupiter included a full design concerning Telecommunications System, Fire Alarm System, BDA System, Public Address System, Access Control/Door Monitoring System, IP Surveillance System, Audio Visual System, BMS /HVAC Controls, Motorola Radio System into the Electrical System. The project design […]
March 4, 2021

Georgia Pacific Crossett

Complete HVAC process controls system for a new tissue machine expansion. QuestCom worked with Haskell, JS Thomas Mechanical, Georgia Pacific, and Jacobs Engineering in support of the design and installation of the highly complex controls system. QCG was responsible for […]
March 4, 2021

Georgia Pacific Port Hudson

Complete HVAC process controls system for a new tissue machine expansion. QuestCom worked with Haskell, Ivey Mechanical, Georgia Pacific, and Jacobs Engineering in support of the design and installation of the highly complex controls system. QCG was responsible for the […]
March 4, 2021

Mercedes Benz

Mercedes Benz included a full design build concerning, FA System, Telecommunications Cabling System, CCTV System and Access Control System throughout the expansion area as well as in the existing facility. The project consisted of preparing FA Engineered design drawings/permit issue […]
March 4, 2021

Wave

Project Wave included a full design concerning Telecommunications System, Fire Alarm System, Access Control/Door Monitoring System, CCTV System, Audio Visual System and Public Address System into the Electrical System. The project design included AutoCAD drawings/Design Documentation 60%, 90%, Permit Issue […]
March 4, 2021

Rolls Royce

Rolls Royce included a full design concerning Telecommunications System, Fire Alarm System, Access Control/Door Monitoring System, CCTV System and Public Address System into the Electrical System. The project design included AutoCAD drawings/Design Documentation 60%, 90%, Permit Issue (PI), Construction Issue […]
March 4, 2021

SAFT Project Thunderbolt

SAFT Project Thunderbolt included a full design concerning Telecommunications System, Fire Alarm System, Access Control/Door Monitoring System, CCTV System, Audio Visual System and Public Address System into the Electrical System. The project design included AutoCAD drawings/Design Documentation 60%, 90%, Permit […]
March 4, 2021

Sheetz Expansion Claysburg

Sheetz Expansion Claysburg included a full design build concerning, FA System and FA System pathways throughout the expansion area as well as in the existing facility. The project consisted of preparing FA Engineered design drawings/permit issue drawings, specifications, shop drawings/submittals, […]
March 4, 2021

Fort Riley Warrior Zone

Fort Riley Warrior Zone included a full design concerning Audio/Visual System into the Electrical System. The project design included providing AutoCAD drawings/Design Documentation 60%, 90%, Permit Issue (PI), Construction Issue (CI), Engineering and Design Coordination, submittals/shop drawings and System Specifications. […]
March 4, 2021

Ozarka Facility Disaster Recovery

Ozarka Facility Disaster Recovery included repairs and upgrades to the existing Access Control System.  Project Location Hawkins, Texas General Contractor The Haskell CompanyProject Duration 2 MonthsSize of Project 114+ ThousandProject Details Access Control System Repairs/Upgrades
March 4, 2021

Landstar Laredo

Landstar Laredo included a full design concerning Telecommunications System, Fire Alarm System, Access Control/Door Monitoring System, CCTV System, Audio Visual System, Public Address System and Fence Detection into the Electrical System. The project design included AutoCAD drawings/Design Documentation 60%, 90%, […]
March 4, 2021

De Waffelbakkers

De Waffelbakkers included a full design concerning Access Control/Door Monitoring System. The project design included submittals/shop drawings. The project installation included providing and installing conduit pathways, Access Control/Door Monitoring equipment, Access Control/Door Monitoring devices, Access Control/Door Monitoring wire, Access Control/Door […]
March 4, 2021

In-N-Out Palmer Systems

INO Project Palmer included a full design concerning Telecommunications System, Fire Alarm System, Access Control/Door Monitoring, IP Surveillance System, and Public Address System into the Electrical System. The project design included AutoCAD drawings/Design Documentation 60%, 90%, Permit Issue (PI), Construction […]
March 4, 2021

In-N-Out Palmer Design

INO Project Palmer design included a full design concerning Telecommunications System, Fire Alarm System, Lock-Down Alert System, Access Control/Door Monitoring, IP Surveillance System, Paging System and Audio/Visual System into the Electrical System. The project included AutoCAD drawings/Design Documentation 60%, 90%, […]
March 4, 2021

In-N-Out Dallas

INO Dallas included a full design concerning Telecommunications System, Fire Alarm System, Access Control/Door Monitoring System, IP Surveillance System, Audio/Visual System, Public Address/Intercom System and Ammonia Annunciation System into the Electrical System. The project design included providing AutoCAD drawings/Design Documentation […]
March 4, 2021

Frito-Lay GES Rancho Cucamonga

Frito-Lay GES Rancho Cucamonga included a full design build concerning, FA System and FA System pathways throughout the facility. The project consisted of preparing FA Engineered design drawings/permit issue drawings, specifications, shop drawings/submittals, permitting, as well as providing and installing […]
March 4, 2021

Project Baja

Project Baja included a full design concerning Telecommunications System into the Electrical System, Network Equipment/Wireless Network Equipment/Process Servers into the Electrical System, Fire Alarm System, Access Control/Door Monitoring into the Electrical System, IP Surveillance System into the Electrical System and […]
March 4, 2021

Big Lots Tremont

Big Lots Tremont included a full design build concerning, FA System and FA System pathways throughout the facility. The project consisted of design as well as providing and installing conduit pathways, cable tray pathways, power, FA equipment, FA devices, FA […]
March 4, 2021

Gulfstream Product Support MRO

Gulfstream Product Support MRO included a full design build concerning telecommunications infrastructure, FA System, Public Address/Intercom System and pathways throughout the new facility. The project consisted of design as well as providing and installing conduit pathways, cable tray pathways, power, […]
February 28, 2021

AB InBev Telcom

Anheuser Bush Can Plant Expansion included a full design build concerning telecommunications infrastructure and pathways throughout the expansion area and into the existing area of the facility. The project consisted of design as well as providing and installing conduit pathways, […]